Hi everyone,
I have a route design production as below :
Oper No. Priority Operation Next Link Resource Req. Cost Category
10 Primary Process 1.1 20 Resource R1 R1-Depreciation
10 Secondary1 Process 1.2 20 Resource R1 R1-Repair
10 Secondary2 Process 1.3 20 Resource R1 R1-Labor
20 Primary Process 2.1 0 Resource R1 R1-Depreciation
20 Secondary1 Process 2.2 0 Resource R1 R1-Repair
20 Secondary2 Process 2.3 0 Resource R1 R1-Labor
I use secondary process because I have one or more cost category for each resource.
I can use this route design into job scheduling of batch order in AX 2012, but why I can't use this route design into job scheduling of batch order in AX 2012 R2 ? this route design only running when I use operation scheduling of batch order in AX 2012 R2.
If I try to running this route into schedule job, system give me error message "Production order No. ##### could not be scheduled. Not enough capacity".
Anyone know why this happened?