Production order No. ##### could not be scheduled. Not enough capacity

$
0
0

Hi everyone,

I have a route design production as below :

Oper No.       Priority                   Operation           Next Link      Resource Req.           Cost Category

10                  Primary                Process 1.1            20                 Resource R1            R1-Depreciation

10                  Secondary1        Process 1.2            20                 Resource R1             R1-Repair

10                  Secondary2        Process 1.3            20                 Resource R1             R1-Labor

20                  Primary                Process 2.1              0                 Resource R1             R1-Depreciation

20                 Secondary1         Process 2.2              0                 Resource R1              R1-Repair

20                 Secondary2         Process 2.3              0                 Resource R1              R1-Labor

I use secondary process because I have one or more cost category for each resource.

I can use this route design into job scheduling of batch order in AX 2012, but why I can't use this route design into job scheduling of batch order in AX 2012 R2 ? this route design only running when I use operation scheduling of batch order in AX 2012 R2.

If I try to running this route into schedule job, system give me error message "Production order No. ##### could not be scheduled. Not enough capacity".

Anyone know why this happened?