masterplanning for discrete production

$
0
0

I want to setup masterplanning for an item (let's say XX), it needs one resource for a production process. Every production proces have four sequence operation (let's say Oper01, Oper02, Oper03, Oper04). I have some resources to produces XX's item (let say R1, R2, and R3). To produce XX's item I can use R1, R2 or R3. Each resource has different capacity. So I use capability for this problem which the resource member are R1, R2, R3.

But if I run master scheduling, the system generate some plan batch order where oper01 use R1, oper02 use R2, oper03 use R3 and oper04 use R1. I expect if system choose R1 for a plan batch order, so oper01, oper02, oper03, oper04 must use R1.

What should I do to solve this?