When using multiple site set-up in AX. We use 3 main production facilities. Producing item 1, item 2
EUR1/EUR2/IND
Subsequent items are then used in next production processes converting item 1, item2 à item 1a, item 2a. This is done in 4 alternate locations
EUR1a/EUR1b/EUR2a/IND1
Item1a, item 2a have a BOM attached to it. BOM states that it can be used in WHS pertaining to locations EUR1/EUR2/IND.
The BOM is used by many sites, each site containing different WHS, BOM line cannot designate correct WHS.
If we add more BOM same composition different WHS, how does AX know which specific site to generate Production Orders?
Can it be done through correct routing? E.g. “work order consumption”
Does this routing need to have sub-routes in both item1 and item 1a? How will the system then designate different sites correctly?